Ceramic Tile Installation Jsa
F foot injury from dropping bag of tiles on foot or tile bar 1 wear steel toed safety boots.
Ceramic tile installation jsa. It focuses on the relationship between the worker the task the tools and the work environment. Tile set and grouted with chemical resistant furan. Ansi a108 13 installation of load bearing bonded waterproof membranes for thin set ceramic tile and dimension stone. Method statement for tiling at floors.
For example the use of ladders and duct lifts may be used for ceiling tile installation or repair as well as installing crown molding cross tees ceiling panels or even full ceiling tile grid installations. Before installation of porcelain tiles place a 1000 gauge polythene sheet protected by 10mm mortar layer and coordinate floor water proofing works with the porcelain tiles installer. 1 identify trip hazards. Carrying heavy weight tiles tile roller and other equipment sometimes up multiple flights of stairs.
Be sure to either insert spacers as each tile. Through this app a job safety analysis and job hazard analysis can be performed which identifies the job steps and procedures as well. Begin by installing tiles in the center of the room one grid at a time finishing each grid before moving on to the next. Apply tile adhesive to the wall in the required thickness.
Over time this evolved into a job safety and environmental analysis jsea at the focus on environmental impacts increased. With the change of legislations and workplace health and safety whs harmonisation across australia jsa s and jsea s have evolved to be know as safe work method statements swms. Always have two people carrying tile roller and other heavy objects. Within each grid it will help to start the first tile in the corner and work outward.
Know your capacity for lifting weight and get help if needed. Here are just a few of the key inclusions working on roofs construction and or repair site establishment setting up the work area installing roof tiles sarking battens bed and point roof access fall edge protection tile elevator loading tiles on. Tile set and grouted with water cleanable chemical resistant tile setting epoxy mortar. Tile set over a crack isolation membrane.
One of the best ways to determine and establish proper work procedures is to conduct a job hazard analysis jha. Wall and floor tilers job safety analysis jsa documents provide support with the management of work health safety whs for wall tilers and floor tilers instant download of documents and procedures for the australian building and construction industry to assist developers builders tradespeople and owner builders. A site specific risk assessment was referred to as a job safety analysis jsa. 2 in case of serious fall seek medical attention.
The roof tiling installation job safety analysis jsas is a complete and comprehensive document that outlines all the on site procedures. Tile set over a waterproof membrane. Using a slight twisting motion set tiles one at a time and avoid sliding them into place. Old mastic on floor tiles and pieces stick to shoe electric cords hand tools staircase vacuum carrier wheels jam.
Jha sometimes referred to as a job safety analysis jsa is a written description of job tasks identifying hazards before they occur. 3 record in daily log injuries of any kind.